RBC case study of modular hoarding in Toronto showing how reusable panels can be re-positioned as construction progresses and hoarding requirements change.
RBC case study of modular hoarding in Toronto showing how reusable panels can be re-positioned as construction progresses and hoarding requirements change.
The Greenloc team along with Argo Development Corporation and TACC Construction collaborated to install almost 1,200 linear feet of Greenloc Hoarding
Greenloc supplied and installed hoarding to enclose the perimeter of the construction site.
QuadReal was looking for a solution to streamline costs and operations associated with hoarding.
Greenloc supplied and installed hoarding for store renovations at the RioCan Yonge-Eglinton Centre.
The Greenloc team partnered up with Shaw Communications and Ledcor to supply hoarding for the renovation of Shaw’s headquarters located in Calgary, Alberta.
The Greenloc team and PCL Construction worked together to install 200 feet of Greenloc Hoarding at the Toronto-Dominion Centre
Greenloc worked closely with the team at North America General Contractor (NAGC) to supply and install hoarding for their Tim Hortons renovation at The Atrium on Bay – a large retail and office space in downtown Toronto.
The Greenloc team and Deman Corporation worked together to supply and install the Greenloc system at the Honda Plant in Alliston, Ontario.